Warning: Undefined array key 0 in /www/wwwroot/zhuanlun.169e.com/wp-includes/media.php on line 83

Warning: Undefined array key 1 in /www/wwwroot/zhuanlun.169e.com/wp-includes/media.php on line 84

Warning: Undefined array key 0 in /www/wwwroot/zhuanlun.169e.com/wp-includes/media.php on line 83

Warning: Undefined array key 1 in /www/wwwroot/zhuanlun.169e.com/wp-includes/media.php on line 84

Warning: Undefined array key 0 in /www/wwwroot/zhuanlun.169e.com/wp-includes/media.php on line 83

Warning: Undefined array key 1 in /www/wwwroot/zhuanlun.169e.com/wp-includes/media.php on line 84

Warning: Undefined array key 0 in /www/wwwroot/zhuanlun.169e.com/wp-includes/media.php on line 83

Warning: Undefined array key 1 in /www/wwwroot/zhuanlun.169e.com/wp-includes/media.php on line 84

Warning: Undefined array key 0 in /www/wwwroot/zhuanlun.169e.com/wp-includes/media.php on line 83

Warning: Undefined array key 1 in /www/wwwroot/zhuanlun.169e.com/wp-includes/media.php on line 84

Project Background

The painting stage of construction-machinery coating lines requires constant temperature and humidity.

Challenges

In the plum-rain season, excess humidity causes paint defects and high rework rates.

Solution

Desiccant Rotor DehumidifierPrecise humidity control, combined withRotary Heat Exchangerrecovers exhaust energy from the paint booth.

Results

Paint-booth dew point stable, rework rate down, overall energy reduced by 14%。

除湿与热回收联动

工业涂装线对温湿度要求严格,将转轮除湿与热回收联动,可在控制露点的同时回收排风能量,降低再生加热与新风处理能耗。合理的系统匹配能兼顾产品质量与运行成本,是高端涂装线的优选方案。

系统整合

将除湿再生热与热回收预热耦合,让余热梯级利用,比单独配置更节能;控制上需协调露点与温度设定。

系统整合

将除湿再生热与热回收预热耦合,让余热梯级利用,比单独配置更节能;控制上需协调露点与温度设定,发挥整套系统的最大效益,适合高端涂装线的精益生产。

高端涂装对品质敏感,系统调试应围绕露点与能耗双目标展开;调试记录应固化到运行手册,便于操作人员稳定维持最佳状态。

建议将调试围绕露点与能耗双目标固化到运行手册,使操作人员能稳定维持最佳状态,让高端涂装线在品质与成本间持续取得平衡,发挥系统最大效益。


0 Comments

Leave a Reply

Quick:Product CenterApplication CasesSizing GuideOnline InquiryEco:Air Heat Exchanger (air69)Qiyu HVAC (en159)169e Hardware / AI
en_USEnglish